  • Rubin 标称的50 petaflops稀疏FP4,是团队认为这次真正可用、而不只是「Jensen math」的第一个稀疏算力数字。 Howie解释,与结构化稀疏不同——后者要求「把每隔一个数据点……强制变成0」,在FP4下「基本完全没被用起来」,因为模型无法收敛——Transformer Engine中的新型自适应压缩引擎会动态压缩数据流:实际以35 PF的稠密算力处理,最高可实现约50 PF有效算力(Blackwell Ultra为15 PF)。NVIDIA宣称的5x,是拿Rubin稀疏算力对比Blackwell稠密算力。
  • HBM4的核心是供应商差异化带来的取舍:NVIDIA希望单颗芯片达到22 TB/s带宽,而Blackwell单颗为8 TB/s,显著高于JEDEC规范,并非所有供应商都能达标。 Copper补充,Micron为底 die保留了晶体管质量相对较差的DRAM工艺,SK hynix转向TSMC N12,Samsung则采用自家的4nm;其中Micron「在达到目标速度方面遇到了困难」。结果是,「大量出货的Rubin可能达不到宣传的内存带宽」,GPU实际上会按HBM供应商分档。
  • NVLink 6通过双向SerDes把scale-up带宽翻倍,却没有让线缆数量翻倍——市场宣传的「400G SerDes」,本质是同一根物理线缆上以200G双向运行。 单个交换机的带宽没有增加,因此每个机架的交换机数量从18个翻倍至36个;Howie指出,这让交换机die得以维持单体设计,因为上一代已经触及约800mm²的光罩尺寸上限。背板硬件与Blackwell不变,实际单向吞吐量也会低于400G的最佳情况。
  • 「无缆」计算托盘是一次面向制造性的设计,PCB内容量大致翻倍——被移除的是Ethernet和PCIe线缆,不是NVLink线缆。 Wega将其与GB200的爬坡痛点联系起来:狭小装配空间里,线缆会刮伤连接器,导致良率低、调试困难;新的模块化Strada/midplane/Orchid设计,配合只有3家供应商能够完成或正在与NVIDIA合作开发的自动化方案,把计算托盘装配时间从「2小时缩短到5分钟」。Trainium更早采用了无缆设计,但代价是成本更高:石英玻纤midplane材料钻孔良率更差,是否降规格仍「在讨论中」。
  • Rubin单颗GPU的功耗和散热跃升至2.3 kW(Grace Blackwell Ultra为1.4 kW),解决方案是渐进式演进,而非架构革命。 微通道盖板还没准备好满足上市节奏,因此方案改为两片式均热板加加强件,以控制翘曲;通过电镀金来抵御腐蚀液态金属TIM;提高冷却液流速,则可支持45°C进水的无冷水机设计——这是选项而非强制要求,因为「并非所有东西都针对Rubin优化」。液冷母线和直接向Strada板转换的50V供电,则构成机架层面的其他变化。
  • 在DRAM供应趋紧之际,NVIDIA重新接管了SoCAMM采购,这可能带来相对竞争对手的定价稳定优势。 Wega估计,NVIDIA已为SoCAMM签下当前Rubin部署可供量的约一半(「Jensen去韩国吃炸鸡……肯定是有原因的」),再加上利润转售给客户,使其成为BOM中两位数占比的项目。Jordan认为,稳定的投入成本让NVIDIA能够在边际订单上击败AMD和Trainium;后两者可能「更容易暴露在DRAM价格市场的变化之下」,而HBM价格仍可能迎来大幅上涨。
  • 时间表是:机架系统在2026年下半年出货,大规模部署更可能落在2027年上半年,Rubin Ultra(1TB HBM4E、16 stacks)计划于2027年下半年推出。 团队预计其爬坡会比GB200更顺利——供应链、机架组装商和测试站点电力都已到位——但「以NVIDIA推进的速度……总会可能出现一些磕绊」。下一个重大系统挑战是Kyber,而不是Rubin。
摘要 · 为研究而整理的核心内容

1. 稀疏FP4终于有了实际意义:自适应压缩引擎

  • 芯片本身由两颗大型计算die、8 stacks HBM4组成,I/O则拆分到侧边chiplet,分别服务于NVLink C2C和NVLink 6。Wega给出的核心数字是:35 PF稠密FP4,对比Blackwell Ultra的15 PF;此外还有「50 petaflops稀疏算力」,而且这种稀疏「不同于」NVIDIA在Hopper和Blackwell上宣传的方案。
  • Howie解释,NVIDIA宣称Rubin的稀疏FP4算力「最高是GB200的5倍」,但这是拿Rubin稀疏对比Blackwell稠密。Transformer Engine中的新硬件压缩机制会「直接观察数据流并动态压缩」,而不是强制每隔一个数值归零,因此实际处理以35 PF运行,最高可实现50 PF有效算力——「这是一种混合方案,不会像强制把数据变成0那样损失精度」。
  • Howie认为,这一点之所以重要,是因为结构化稀疏在低精度场景「基本完全没被用起来」——「一路降到FP4……模型无法收敛」——因此这一代产品可以「真正拿回稀疏算力」。Jordan对这段历史的概括是:经历了4、5代「Jensen math」把宣传FLOPs翻倍之后,「我们预计这次稀疏性能能以过去做不到的方式真正发挥作用」。

2. HBM4达到22 TB/s:超越JEDEC规范,并将导致供应商分档

  • Wega的计算是:HBM4将每个stack的I/O数量从1,024翻倍至2,048,而NVIDIA要求供应商维持相同的pin速率,目标是Rubin单颗芯片22 TB/s,对比Blackwell单颗芯片8 TB/s,约为2.5x。问题在于,原始JEDEC规范「低得多」,而不同供应商的「准备程度各不相同」。
  • 底 die工艺的分化最能说明问题:Micron继续采用晶体管质量相对较差的DRAM工艺,SK hynix采用TSMC的N12逻辑工艺,Samsung则「全力投入」自家的4nm。结果是,Micron尤其「在达到目标速度方面遇到了困难」,因此「Rubin很可能会有大量出货产品低于宣传的内存带宽」——Jordan的总结是,GPU会按HBM供应商分档。
  • 容量维持在288GB,因为密度无法提升:16-high stacks尚未实现规模出货,而TSV布线翻倍会吞噬die面积,因此单层密度从HBM3到HBM4基本持平。Rubin Ultra通过将stack数量翻倍至16个,并采用16-high HBM4E,把容量提升到1TB(每个stack 54GB,12-high stack则为32GB)。Copper提醒,DRAM「非常紧张」,因此XPU设计商最终可能需要「配给或调整……容量或许会低于最初规划」。Copper还纠正了术语:不是「R200」——「把200去掉,就是Rubin」。

3. NVLink 6靠双向SerDes诚实地「绕过物理限制」实现带宽翻倍

  • Wega的核心观点是:NVSwitch单个交换机的带宽没有提升,因此每个机架的交换机数量从18个增至36个(9个托盘、每个4个封装);市场宣传的「400G SerDes」,实际是每根物理线缆以200G双向运行,在「相同物理布线量」下实现带宽翻倍,背板硬件也与Blackwell相同。他保留了这一判断:400G单向传输是「最佳情况,但不太可能达到」。
  • Howie补充了为何选择增加芯片数量,而不是提升单颗芯片的带宽:上一代交换机die已经达到光罩尺寸上限,超过800mm²,因此在单个封装内把带宽翻倍「会非常困难」——否则就必须采用chiplet。现在每条Rubin到交换机的链路都是单条400G链路,不再需要多个端口。

4. 无缆设计的本质是良率,PCB成为新的BOM争夺点

  • 关键修正是:被移除的不是NVLink协议线缆,而是Ethernet和PCIe线缆;背板中仍保留线缆。动机来自GB200爬坡期的教训:工人需要在狭小空间内布置10–20根线缆,装配过程中连接器「会被刮伤」,之后还要艰难排查究竟是哪根线缆失效。Jensen在CES上称,自动化装配能把计算托盘的装配时间从「2小时缩短到5分钟」;目前只有3家供应商能完成这套自动化,或正在与NVIDIA合作开发。「这有点像搭乐高。」
  • 架构上,后部是2个Strada模块(每个包含2颗Rubin GPU和1颗Vera CPU),中间是midplane桥接,前部是4个搭载CX-9的Orchid模块——所有信号都走PCB,使PCB面积相对Blackwell增至「2倍或更多」,材料也大幅升级。midplane采用业界先进的石英玻纤,但材料硬度过高,可能拉低钻孔良率;NVIDIA是否将规格降至高端玻纤布,「目前仍在讨论」。
  • 当被问及NVIDIA是否首创这一方案时,Wega将功劳归给Trainium——后者是首个无缆设计,Amazon在re:Invent上连续2年推动,但采用的是横跨整个机箱的「一整块大型baseboard」(Amazon称这是一个面向上市节奏的决策),而NVIDIA选择了模块化方案。取舍不在可维护性上(「这里的可维护性更好」),而在成本上。至于封装本身,Myron认为NVIDIA「更加保守」:AMD正在推进hybrid bonding/SoIC,「MI300X以来就一直在做」。

5. 单颗GPU 2.3 kW:让系统扛住功耗和散热的工程技巧

  • Rubin单颗GPU的TDP从Grace Blackwell Ultra的1.4 kW提升至2.3 kW。集成于封装内的微通道盖板,也就是冷板,还不够成熟,无法用于首批部署;替代方案包括:两片式均热板加加强件,以控制更大封装的翘曲;在盖板和冷板上都采用电镀金,因为液态金属TIM「会腐蚀铜」;同时缩小冷板通道间距,以增加换热面积。
  • 大家讨论的45°C进水温度,本质是基础设施方案,而不是芯片本身的技巧:通过提高流速、缩小进出水温差(45°C进水、65°C出水),可以实现无冷水机数据中心。Wega强调,「无冷水机设计不是一套适用于所有场景的解决方案……但它是一个有助于降低TCO的选项」——数据中心还要承载其他硬件,产品路线也会变化。NVIDIA的参考设计显示,其散热性能约为Blackwell的2倍。
  • 供电方面,系统采用液冷母线,因此不需要风扇;Strada计算模块本身则将50V到12V的转换移到板上。每个Strada模块承载5 kW,把降压环节尽可能靠近封装是「正确的设计选择」,有利于提升效率。网络模块仍由供电板完成降压。HVDC电源机架属于可选项,但其时间表「正在提前」,部分Rubin部署可能会采用。
  • 总体而言,架构仍与Grace Blackwell大体相似;系统层面最大的变化是PCB内容量,而相当一部分性能提升来自半导体侧。

6. SoCAMM争夺战,以及指向2027年上半年的2年节奏

  • Wega认为最具交易价值的观察是:SoCAMM——Vera CPU使用的插接式LPDDR模块,用来替代焊接式LPDDR——过去由客户采购,但在内存供应紧张之际,NVIDIA「重新接管了采购责任」,签下当前Rubin部署可供量的「约一半」。「Jensen去韩国吃炸鸡,肯定是有原因的。」客户通过NVIDIA的利润率承担这笔成本,使SoCAMM成为BOM中两位数占比的项目(不计利润则为个位数);在已签约部分,供应和价格都已锁定。
  • Jordan据此得出的竞争结论是:投入成本稳定后,NVIDIA「可以让边际订单的交易成立」,从而与AMD或Trainium竞争;后两者可能「更容易暴露在DRAM价格市场的变化之下」。Wega补充了关键风险:HBM「可能会出现大幅涨价」。
  • 时间表共识是:机架将在2026年下半年出货,但Myron基于Blackwell的提醒仍然适用——「开箱即用、马上达到最佳性能……从来都不太可能」;因此大规模部署将在2027年上半年,Rubin Ultra则计划于2027年下半年推出。Jordan给出的Blackwell参照是:CoreWeave的首个机架于2024年11月交付,2025年2–3月开始实际使用,2025年5–6月实现规模部署。Wega认为这次爬坡会更顺利:机架组装商已有产能,测试站点电力也已落实,不像GB200早期那样受限;但「总会可能出现一些磕绊」,而且「下一个重大挑战将是Kyber」。
Jordan Nanos

Hello, everyone. Welcome back to episode 3 of the SemiAnalysis weekly podcast. I'm Jordan Nanos. I'm here with Copper Wei (Wega), Myron Xie, and Howie, the undisclosed Howie from an undisclosed location. Copper's also got his glasses on; he's ready to play poker. Myron's back.

This week, we're going to talk about the article that we put out on Vera Rubin, “Extreme Co-Design,” and walk through a lot of the updates that we're expecting this year. We'll talk about sparsity, peak marketed FLOPs, the changes from Grace to Vera, the system server side, and how everything's going cableless. I've got 3 experts here to talk about it, all of whom are working on our accelerator and supply chain team for AI. Welcome to the show, guys.

Howie

Good to be on.

Myron Xie

Thank you, Jordan.

Copper Wei (Wega)

Thanks, Jordan.

Jordan Nanos

All right, let's start by talking about Vera Rubin and the concept of Extreme Co-Design. Obviously, Rubin is the new GPU that's going to replace Blackwell. There have been a lot of improvements. Can you give me a high-level overview of what's new with it and how you would introduce these changes?

1. Rubin Changes The Compute Equation

Copper Wei (Wega)

Howie, we have a Rubin floor plan. If you bring that up, we can see a lot of interesting things. What's interesting with Rubin is that, compared to Blackwell, it has 2 big compute dies and 8 stacks of HBM, with HBM moving to HBM4. We also have the I/O chiplets being disaggregated into separate chiplets on the sides for NVLink C2C and NVLink 6.

This comes with a big improvement in memory bandwidth and peak marketed FLOPs. For FP4, it goes to 35 petaflops dense versus 15 for Blackwell Ultra. They also have 50 petaflops sparse, which is interesting because this is a different type of sparsity. Howie, can you talk a bit about the adaptive compression engine that we see in Rubin and how it differs from the sparsity that NVIDIA has marketed previously, in the Blackwell and Hopper generations?

Howie

Sure. In this example, NVIDIA is marketing up to a 5-times increase in sparse FP4 performance compared to the Blackwell GB200. What they're actually comparing is sparse on Rubin versus dense on Blackwell, and they're able to claim that because of this new hardware compression in the Transformer Engine.

Instead of doing structured sparsity, which is what has been done before, where you force every other data point in your tensor and matrix into zeros, the Transformer Engine now directly looks at the data stream and dynamically compresses it. That allows you to deliver up to 50 petaflops of effective compute while the actual processing is done at 35 petaflops.

It's almost like a hybrid approach where you don't have the accuracy losses of forcing the data to be zero, while also achieving some level of speedup. We believe this is important because structured sparsity wasn't really used at all, especially at the lower precisions down to FP4. The models wouldn't converge, and there were a lot of accuracy issues. With this new adaptive compression, we believe you can effectively reclaim your sparse performance.

Jordan Nanos

Exactly.

Okay, cool. Let's take it back a step just to do some history. We've been dealing with Jensen math for 4 or 5 generations now, since sparsity was introduced as a concept. People would double the peak theoretical FLOPs for a given data type: FP32, then FP16 with the bfloat16 data type, and then FP8. Now we're at FP4, with different variations, and NVIDIA obviously pushing NVFP4.

The peak marketed FLOPs of 50 petaflops is a huge generation-on-generation increase that you might think is attributable to this Jensen math with sparsity. To be clear, the difference with this one is that we expect this sparsity to work, or to be useful, in a way that it previously wasn't.

Howie

Exactly.

Jordan Nanos

Okay, cool. What else? We have the picture on screen for those who are just listening. The point about the 50 petaflops and the sparse NVFP4 points to the SMs within the GPC on the GPU, but there is plenty of other stuff that makes up this GPU. We have PCIe interfaces, NVLink C2C, NVLink 6.0, and the HBM controllers with 288 GB of HBM4.

Let's go through that one by one, starting with HBM. The 2 fundamental pieces here are FLOPs and memory bandwidth. We don't actually have a firm specification for the HBM4, depending on the SKUs, but it's still a significant increase over the Blackwell generation.

2. HBM4 Creates A Supply Bottleneck

Copper Wei (Wega)

What's interesting with this generation is that we've moved from HBM3e to HBM4. The density, in terms of capacity, of HBM3e and HBM4 is the same as 3e, but there's a huge increase in memory bandwidth. The reason is that you effectively double the number of I/Os per stack to 2,048 versus 1,024, which was the case for HBM3e and all the HBM generations before that. You have double the wires.

What's happening is that NVIDIA is pushing suppliers to offer HBM4 with the same pin speed. That effectively gives you approximately double the bandwidth per stack. In this case, it's more than double. NVIDIA wants to hit 22 TB per second of memory bandwidth for Rubin, compared to 8 TB per second per chip for Blackwell. That's about 2.5 times the memory bandwidth.

The interesting thing is that the original specification for HBM4 from JEDEC—the committee that sets all the standards for memory—was much lower in terms of speed than what NVIDIA is pushing for. As a result, suppliers—Samsung, SK hynix, and Micron—have different levels of preparedness for these speeds.

We've seen some specific choices in the architecture of HBM4 from Micron and, to an extent, SK hynix that may not have been correct for hitting these speeds. Notably, one of the big differences is in the base die of an HBM4 stack, which is where the PHY that interfaces with the host XPU is located.

Micron has chosen to stay on a DRAM process for the base die, which has relatively poor-quality transistors. SK hynix chose to adopt an N12 logic process from TSMC, while Samsung is going all out and has chosen to use its own Samsung 4-nanometer process.

As a consequence of these choices, we're seeing some of these memory suppliers, particularly Micron, having trouble hitting the speeds that NVIDIA wants to reach 22 TB per second. I think it's quite likely that a lot of Rubin will ship with lower-than-advertised memory bandwidth.

Jordan Nanos

They're going to bin the Rubin GPUs effectively based on which HBM supplier they get capacity from for it.

Copper Wei (Wega)

Yeah.

Jordan Nanos

Super interesting. What do you think about the design decision to stick with 288 GB of density compared with the Blackwell Ultra, such as GB300?

Copper Wei (Wega)

There are a few ways you can expand HBM capacity. You can add more stacks, which is probably not possible given the packaging and die-outline constraints here. The other way is to go to a higher layer count in the HBM.

The thing is, we haven't really seen 16-high stacks, which would be the next higher tier of stack counts. Twelve is probably the default now, so we haven't seen any of the suppliers able to ship 16-high stacks in volume. As we increase those stack counts within an HBM cube, it's becoming a greater packaging challenge and getting more and more difficult.

With HBM4 and 3e, the DRAM density within each layer is the same. In some generations, you get a density increase. For example, with HBM3e, each die had higher density than HBM3. But between HBM3 and HBM4, it's the same.

Part of that is because you need to dedicate more area to the TSVs, which goes back to the wiring point I mentioned earlier: doubling the I/Os has an area implication. Therefore, with HBM4, to keep die sizes in check, the density isn't really increasing. That's why, for Rubin versus Blackwell Ultra, the 288 GB of HBM per chip is static.

Jordan Nanos

Now, obviously, we're talking strictly about the R200 in these cases, right? There is a—

Copper Wei (Wega)

Yeah. Although—

Jordan Nanos

Rubin Trail—

Copper Wei (Wega)

Although the R200 terminology is not what we used.

Copper Wei (Wega)

It's just the Rubin GPU.

Jordan Nanos

Okay, my fault.

Copper Wei (Wega)

Drop the 200.

Jordan Nanos

Fair, fair enough. Yeah.

Copper Wei (Wega)

They don't like the 200.

Copper Wei (Wega)

Yeah.

Jordan Nanos

Oh, yeah. Okay. But there will be a Rubin Ultra in addition, which—

Copper Wei (Wega)

Yes.

Jordan Nanos

Yeah, it takes us all the way up to 1 terabyte of memory—1024.

Copper Wei (Wega)

1 terabyte. So, when you think about the Rubin Ultra, how they get there is they double the stacks to 16 from 8. So that's 2× scaling. They want to use 16-high HBM4E, which brings the capacity of each stack to—is it 48 gigs? Sorry, no, 54 gigs—versus, say, only 32 for a 12-high stack of HBM4.

So that's how you get a quadrupling of memory capacity from Rubin to Rubin Ultra. But I think the question is, DRAM—HBM and conventional DDR—is very tight. I think XPU designers are probably thinking about supply-chain realities and, to the extent that they can secure memory, this may mean there's more rationing or skewing of different XPUs, with perhaps lower capacity than initially planned.

Jordan Nanos

Cool. So, what do you guys want to talk about next? Do you want to go to NVLink-6 and talk a bit about packaging? Wega, we can bring you in there. We can also talk about—

Speaker 3

We can talk about NVLink-6, and what's interesting is the bidirectional SerDes.

Jordan Nanos

Yeah, yeah, let's do that. Because I think there are basically 3 ways in which these GPUs change significantly from generation to generation. One is the tensor core, measured in FLOPS, roughly. One is the memory bandwidth or memory capacity—HBM—measured in gigabytes or terabytes now, or per second for the bandwidth. And then the last one would be the interface—

Copper Wei (Wega)

Yeah, so—

Jordan Nanos

And then the last one would be the interface—

3. NVLink Changes The Scale Up Design

Copper Wei (Wega)

So, on the NVLink side, the big upgrade from Rubin to Blackwell was the doubling of the bandwidth of the NVLink domain. But the NVSwitches are not upgraded—the bandwidth per switch isn't upgraded. That means they have to double the number of switches per system, per rack. So, the number of NVSwitches goes up from 18 per rack to 36 per rack. Then we have 9 NVSwitch trays, with 4 per NVSwitch tray.

However, there's another major upgrade that they made here, which is the bidirectional SerDes. This essentially allows you to double your bandwidth without doubling the wiring—the physical connections between these switches and GPUs. They've kept the physical connections, which is the backplane, with the same sort of hardware as Blackwell. They've achieved that with the bidirectional SerDes.

How they've done that is, NVIDIA claims it has 400G SerDes, but instead of sending, let's say, 200G SerDes on a physical wire in 1 direction, each physical wire will have 200G SerDes going in both directions. So, essentially, with that, you double the bandwidth with the same amount of physical wiring.

Jordan Nanos

Yeah. And this was another source of Jensen math in the past, where people would state the theoretical bandwidth as including bidirectionality, when that's not really how anybody uses it. So, this is another case of the hardware catching up to what some of the marketing specs have said in the past, or being moved again to increase the theoretical amount of bandwidth that you can get out of a given switch ASIC and the connections on the GPU itself.

Copper Wei (Wega)

Right. And because of the bidirectional bandwidth, it's marketed as doubling 200G SerDes, right? But in reality, the real performance because of this special setup should be lower, because there might be some real-life—

Jordan Nanos

You're never going to get 400 gig—

Copper Wei (Wega)

Yeah, yeah.

Doug O'Laughlin

—unidirectional on a link.

Copper Wei (Wega)

That is the best-case scenario, but it's unlikely they're going to hit that.

Jordan Nanos

Sure.

Howie

The other interesting thing about the NVSwitch is they've doubled the number of switch chips. To double the bandwidth, instead of doubling the bandwidth per switch, they've just doubled the number of switches. So now, as you can see here, there are 4 switch packages per switch tray, and that means that each link between a Rubin GPU and one of these packages is just a single 400G link, as compared to multiple ports in the previous generation.

I think this was done mainly to keep the switch die as a monolithic, single piece of silicon, because the previous generation was already at the reticle limit—over 800 square millimeters. So, for them to double the bandwidth again while keeping it in the same package would be really challenging. They might have to go to a chiplet design and increase the complexity too much. So, this is the design decision that they went with.

Jordan Nanos

Makes sense. Now, obviously, the thing that anybody who's worked with a GB200 or GB300 system would be thinking about is that backplane and cabling. But that's a big change as well.

4. Cableless Design Simplifies Assembly

Copper Wei (Wega)

There isn't much change on the backplane side. It's the same backplane from Rubin to Blackwell. But the changes that you're mentioning here are mostly on, as Jensen said, the cableless design. That is mostly within the compute tray. Howie, could you pull up a picture of the compute tray?

Doug O'Laughlin

If you're trying to run twice as many cables to the NVLink switch because you've doubled the number of switches per rack, you would think that there's double the amount of cables. But in fact, there are 0 cables in a compute tray for the NVLink scale-up domain at this point.

Copper Wei (Wega)

There are still cables in the backplane, but within the compute tray and within the switch tray, there are no cables.

Doug O'Laughlin

Yeah.

Copper Wei (Wega)

But the cables that are removed are actually not the NVLink protocol ones. They're the Ethernet and PCIe ones.

Doug O'Laughlin

Oh, okay.

Copper Wei (Wega)

As you can see, this is the compute tray of the Vera Rubin. It's a very seamlessly integrated design with a very modular approach. You have 2—we call them the Strada modules—which are the superchips that house 2 Rubin and 1 Vera. Then you have 2 of them at the back of the chassis, and you have the networking modules at the front of the chassis.

With this design, all the signals within the compute tray run on the PCB. There are no more cables. The reason for that is because the initial challenge with GB200 manufacturing and assembly was the very low yield with the cabling. You have workers routing these cables in very tight, dense spaces. You have fans in there, too, and 10 or 20 cables within a very tightly compact footprint.

Oftentimes, these cables are scratched where the cable connects to the connector. That's the most vulnerable part of the cable, and they're scratched during the assembly process as people are rushing assembly. It's also very difficult to route these cables. Whenever they're testing the system, they'll have to go back and figure out which cable is causing connection problems. They have to go back and debug.

With this approach, the cables are removed. It takes human error out of the assembly process. As Jensen said at CES—sorry, not at GTC, at CES—he mentioned that there is an automation process for this assembly, which can reduce the assembly of the compute tray from 2 hours to 5 minutes. That's an incredible step up.

As we understand it, there are only 3 vendors that can do the automation or are working with NVIDIA on the automation. But even without automation, this approach should be much easier, given that you're just putting things together. It's kind of like building Legos, right? You're just putting things together instead of putting them in place and then routing cables.

This all goes in. There will be blind-mate guiding mechanisms, and everything should go into the place where it's designed to be. So, yeah, the big one here is PCB content, of course, because all the signals run on the PCB now.

Given the distance the signal has to travel on the PCB, the material needs to be upgraded. We have 2 drivers of PCB content: material increases and PCB-area growth. As you can see here, the Strada board is slightly larger than the Bianca board of the Grace Blackwell generation.

You also have a midplane between the Strada and the front networking modules that acts as the bridge between the modules. They’re connected via that midplane. At the front of the chassis, there are 4 Orchid modules that house the CX-9. The PCBs don’t just cover the compute tray at the front; they’re stacked on top of each other.

The PCB area in Vera Rubin compared to Blackwell, I believe, is 2 times or more. We disclosed that in our BOM model estimates. It’s a significant step up in PCB area, and the material upgrades are incredible too, so the signal can perform over that distance, which was previously covered by cables. Cable has better signal performance, but now everything has to run on the PCB.

Howie

This cableless design is pretty clever in terms of maximizing manufacturability. Is NVIDIA the first vendor to do this?

Copper Wei (Wega)

Actually, Trainium is the first hardware system that adopts this cableless philosophy. They’ve advocated this at re:Invent for 2 years now. Trainium is the first design, and they don’t have this modular approach. They have just 1 massive baseboard that spans the entire chassis, with the signals running through it.

Amazon claims that it was a time-to-market decision, and NVIDIA later chose a modular approach with the same PCB and cableless design philosophy.

Jordan Nanos

I guess the trade-off there may be in terms of serviceability or reliability. You have issues with the heat?

Copper Wei (Wega)

I think the serviceability is better here. The trade-off is probably cost, as PCBs are getting expensive with these material upgrades, higher layer counts, and worse yield. As you get to higher layers, these are state-of-the-art PCB processes.

The midplane uses a material called quartz fiberglass. It’s a state-of-the-art material for PCBs and PCB layers, and it’s very challenging to process because quartz glass is so hard. That will lead to worse yields when drilling the PCB.

There’s a debate right now about whether they will de-spec from quartz glass, and whether the next, lower-generation material—which is just the higher-end glass-fiber cloth—can have the same signal performance. That is currently under debate.

Howie

Cool. Awesome. Does that wrap up the system stuff, or was there other stuff you wanted to talk about on the packaging?

Jordan Nanos

Myron’s on mute here, but yeah.

Myron Xie

Yeah, packaging, not really. I would say the packaging is broadly similar to Blackwell, except you have a few more chip I/O chiplets on the sides. That increases the interface size and the substrate size.

Technology-wise, there’s nothing too new. I’d say NVIDIA is more conservative on the packaging side, whereas AMD is pushing the technology on the packaging side, given that they have implemented 3D bump-less stacking, or hybrid bonding, which is SoIC according to TSMC’s trade name. They’ve been doing that since MI300X.

I think we’ll start to see more and more implementation of hybrid bonding as we go, as those technologies advance and the cost or economics of it make more sense. We’ll see more and more adoption from both the merchant guys and the ASIC guys.

Doug O'Laughlin

Makes sense. I guess there’s maybe more to talk about in terms of the rest of the system. Obviously, there’s the change to the Vera CPU. For the scale-out network, we’ve got the CX-9 NICs. For the front-end network, we’ve got the BlueField-4. At the switch, we’ve got new silicon for Spectrum-X: Spectrum-6. Anything else you guys want to cover going through?

5. Thermal And Power Limits Rise

Myron Xie

The other thing is that we see this with every generation. One way to get more performance is to increase the power. Rubin is no exception. The maximum TDP per Rubin GPU is going to be 2.3 kilowatts. That compares to Grace Blackwell Ultra at only 1.4 kilowatts.

More power means more heat that you need to dissipate. Wega, maybe you can talk a bit about what’s happening with innovations in cooling or thermal management.

Copper Wei (Wega)

There are several innovations on the thermal-management side of Vera Rubin compared to Blackwell. First, there are innovations on the packaging side. There is a technology called a microchannel lid.

Initially, NVIDIA wanted to push for adoption of this technology, which is essentially having the cold plate packaged together instead of having a heat-spreader lid. You replace the heat-spreader lid with a cold plate integrated into the package.

But there are packaging, logistics, and testing challenges with that design. It is not available in time for market, and it’s not a viable solution for NVIDIA’s first deployment of Rubin. It might be deployed later or in the next generation, but for Rubin, the technology isn’t mature enough in terms of logistics and testing.

However, there are still innovations on the packaging side. As you can see here, the package is the piece below. There’s a lid, an integrated heat spreader, but it’s actually 2 pieces instead of 1 giant piece. Sorry, guys, it’s still Chinese New Year’s time. Someone just set off firecrackers.

Doug O'Laughlin

What was that?

Copper Wei (Wega)

I have no idea.

Myron Xie

The firecrackers.

Doug O'Laughlin

The firecrackers, yeah. Watching a rocket ship take off.

Copper Wei (Wega)

Yeah. Coming back to this, the heat spreader is broken up into 2 pieces. The reason for that is that, given the increased packaging size, if the heat spreader is 1 piece, it will have warpage itself. Even if the heat spreader is so big, it will have warpage, and that warpage will be transferred to the package.

Breaking it up avoids that, so it is a 2-piece solution. It will be combined into a module. There is also the introduction of a stiffener, which brings mechanical support to the package and helps with the warpage of the package.

On top of the heat spreader, there is a layer of electroplated gold. The reason for that is that the liquid-metal hybrid TIM between the cold plate and the heat spreader, which is the package, is corrosive to copper or whatever metal the heat spreader is made of.

As you can see, the cold plate also has a layer of electroplated gold, which helps prevent corrosion from the liquid-metal TIM.

There’s also innovation on the cold-plate side. It’s still a module, similar to Bianca. It will be a big module for the Strata board. However, as you can see here, the channels—which provide the surface area for heat exchange—have a reduced pitch. That increases the surface area for heat exchange, allowing you to remove more heat from the package.

Copper Wei (Wega)

So these are the innovations on the packaging side and the cold plate side for them to achieve that 2,300-watt power design that they’re aiming for.

Jordan Nanos

Can you talk about the inlet water temperature that everybody was talking about when this announcement happened—how it’s going to be 45°C, but it’s not really a big change?

Copper Wei (Wega)

Yeah. That innovation is actually more impactful for the infrastructure design of the data center. The chiller-less design means that you don’t really have to cool the loop that goes into the system to room temperature or below room temperature.

How they achieve that is by increasing the flow rate. When you’re looking at the difference between the inlet and outlet temperature, with a 45°C inlet and a 65°C outlet, which is similar to what Blackwell had, you’ve sort of increased the minimum—sorry, the maximum you have. Basically, you’re minimizing the delta between the inlet and the outlet. By doing that, you have to increase the flow rate to remove the same amount of heat from the system.

Jordan Nanos

Yeah. I mean, I think that’s a pretty incredible trade-off if you can make it work: a 2,300-watt GPU.

Copper Wei (Wega)

Yeah. On the data center design side, we’re seeing some data centers doing this chiller-less design, but not everyone is doing it, because people have different considerations when they’re designing a data center. Not everything is optimized for Rubin. There might be other hardware in the data center, or there could be roadmap changes. Things change very quickly all the time.

We see this trend happening in the market, but the chiller-less design is not a one-for-all solution for Rubin deployment. It’s an option that helps with your TCO.

Jordan Nanos

Yeah. At least the reference design doesn’t mean everybody has to follow it, but NVIDIA’s reference design is suggesting that it would have double the thermal performance compared with Blackwell just by making these changes. Pretty impressive stuff.

Maybe we could wrap by talking about power delivery and then any final thoughts on Rubin. It’s like some major changes, but in some ways it’s quite similar to the GB200 and GB300 design. It’s not as significant a change as what we saw going from Hopper to Blackwell, considering that the full-system design is obviously just increasing specs and increasing the rack design, right?

Copper Wei (Wega)

Yeah. Let’s start with the power delivery. On the power delivery side, there actually are more changes at the rack-level power delivery. Within the IT rack, you’re still receiving 50-volt power. The busbar is a liquid-cooled busbar now because it has a much higher current rating. There are no fans in the system, so you have to use liquid to cool that busbar.

Besides that, another innovation is the 50 volts going directly to the Strata board. I think that is interesting because it increases efficiency. When you do the step-down of the voltage closer to the package, the efficiency is much higher.

Given that the Strata module is taking in 5 kilowatts of power, it is the right design choice to move that 50-volt-to-12-volt conversion closer to the GPU, which previously for GB200 was done on the power delivery board. Previously for GB200, the power delivery board would step down 50-volt power to 12 volts and then deliver that to all the modules in the chassis.

Here, the 50-volt step-down is being done in 2 different places: 1 at the power delivery board for the networking modules at the front of the chassis, and then, for the Strata modules, the 50-volt step-down conversion will happen on the board. That is a power-efficient design.

At the rack level, the power shelf is much higher power. The reference is that the power shelf has much higher power. There aren’t many changes from previous generations, except for higher-power power shelves with much higher density.

But we’re seeing more adoption of the power rack design. That is not a necessity for Rubin, but it’s an option for hyperscalers or customers who are looking at more efficient power delivery at the infrastructure level. We’re looking at high-voltage direct current in these power racks. The timeline for that is being pulled forward. We could see some deployment for Rubin, but it still depends on customers’ choices. That is interesting.

Besides that, the overall power delivery infrastructure is similar to Grace Blackwell. To wrap this up, from the system design perspective—from the hardware perspective—the major difference is on the PCB side. The architecture is very similar to the previous generation. It’s still an Albaron architecture, but they’re taking the lessons they’ve learned from the very incredible ramp of Grace Blackwell.

Of course, there are many challenges with that, but they’ve implemented the lessons and experience learned from that ramp and integrated that into the Rubin design. So, it’s a very interesting evolution from Grace Blackwell to Rubin. Most of the improvement comes from the semiconductor side, I would say. Myron, could you comment more on that?

Myron Xie

Yeah. I think, as we mentioned, there’s a massive improvement in compute. One of the big things, again, is the huge improvement in memory bandwidth. That’s going to be great for inference, which is mostly memory-bandwidth-bound.

Then there’s the whole suite of silicon—not just the Rubin GPU, but also Vera, ConnectX-9, the new NVLink switch, and new networking switches. NVIDIA really is the only company that has end-to-end silicon for pretty much the entirety of the system. It’s pretty impressive, and I’m pretty excited for Vera Rubin. I’m sure Jordan is really excited to test these things when they’re available.

6. NVIDIA Locks Up DRAM

Copper Wei (Wega)

I want to add something. We forgot to talk about the memory situation here. SOCAMM was previously—there’s a step up.

Myron Xie

So, what is SOCAMM? What’s that?

Copper Wei (Wega)

Yeah. SOCAMM is NVIDIA’s specification for a socketed LPDDR4, LPDDR5 module. It’s customized for NVIDIA, and the specification is set by NVIDIA. It replaces the LPDDR that was soldered onto the board for the Grace Blackwell generation.

The benefit is that customers can choose what sort of memory SKUs they want by choosing a SOCAMM with different capacities available. But we understand that previously, SOCAMM would have been procured by the customers themselves.

Given the memory tightness in the market currently, NVIDIA has taken the procurement responsibility back themselves. That means they will bear the cost of the SOCAMM and charge a margin on it. But that provides several benefits.

First, given that they’re probably procuring for the entire Vera Rubin generation or part of it, they’ve contracted maybe half of the deployment availability for SOCAMM currently. So they can have better pricing negotiations with memory vendors. Jensen went to Korea for fried chicken—that is definitely for something. There’s a purpose there, right?

Jordan Nanos

Yeah.

Howie

Another thing is that it also ensures there is no awkward situation where customers have secured the Strata module—the Vera Rubin rack—but haven’t secured the SOCAMM modules because of memory tightness.

Jordan Nanos

Yeah.

Jordan Nanos

Just to be clear, we're talking about the memory that complements the Vera CPU, which is the traditional—

Howie

Yes.

Jordan Nanos

DRAM, so tight in the market, right?

Howie

Yes. It is the traditional DRAM, not the HBM. That is on the Strata module. That is accessed via the Vera CPU. Correct.

Doug O'Laughlin

Yeah. What you're saying is that, in general, there's a lot of discussion in the market right now about memory prices being passed through the supply chain to people who are going to be buying servers. I think what you're saying is that you think NVIDIA is less exposed to increases because they've locked up all of the supply that they'll need for these SOCAMM modules on the Vera Rubin CPUs.

Copper Wei (Wega)

Yes, yes. That ensures pricing stability, at least for what they've contracted. Maybe they haven't contracted the entire amount for the whole Rubin generation, but they have contracted—

Jordan Nanos

How much do you think you can contract with 1 fried chicken visit? Does that get you 6 months' worth of supply? How many billions are we talking about here?

Copper Wei (Wega)

That is a question for Ray.

Jordan Nanos

We'll find out. But NVIDIA probably saw this coming, and they realized, “Okay, we need to lock up as much DRAM as we can.” So, as a consequence, they're going to pay a lot less than what we see in the latest contract pricing or spot pricing.

Copper Wei (Wega)

To be fair, the end customers will still pay for this memory at a price similar to this contract price, right? Or it will be much higher than—

Jordan Nanos

Yeah.

Copper Wei (Wega)

what NVIDIA contracted, right? Because NVIDIA is passing—

Jordan Nanos

And they're going to charge the standard NVIDIA margin of 4 times.

Copper Wei (Wega)

Yes, yes. They should, right? Well, maybe they can't, but they'll try to bring down costs on the other components to make up for the margins they cannot charge.

Jordan Nanos

And, roughly speaking, in terms of the content of the total system, SOCAMM modules attached to the Vera CPU are relatively small compared to the HBM on the GPUs or just all of the rest of the components in the system. We're not talking about SOCAMM being 50% of the BOM or even 25% of the BOM here.

Copper Wei (Wega)

Actually, based on our calculations, it's a significant chunk. It's in the double digits. We've disclosed that in our model, the BOM model, but it is a significant chunk because of the margin that NVIDIA is passing to it. But if there's no margin on it, it'll be in the single digits, right?

Jordan Nanos

Hmm.

Copper Wei (Wega)

But the point here is that the pricing for this is stable, and they can have a secure supply for their customers. That might be challenging if other GPU system vendors did not procure that ahead of time or didn't have any—

Jordan Nanos

Yeah.

Copper Wei (Wega)

Jordan Nanos

It's a huge impact on somebody's purchasing decision, right? They always have to make an adjusted performance-per-dollar decision. We can look at the specs and see what the performance is, but the other thing is how much they're going to have to pay for the system, which is the denominator there.

If their input costs on their GPU systems are stable, then they have a lot more control over how much they're going to charge their customers, and they can make deals that are on the margin work if they're competing against GPU, Trainium, or AMD, which may be more exposed to changes in the DRAM pricing market. Or HBM, too. I mean, everything's constrained, right?

Copper Wei (Wega)

Yeah. There could be a high price hike coming for HBM, right?

Jordan Nanos

Cool. Okay. Well, good job so far, guys. Anything else that you think we should cover here before we wrap up?

Copper Wei (Wega)

I think I've covered most of what's in the article and the important part of this Vera Rubin evolution. It's been fun, taking a lot of time, but—

7. Rubin Deployment Takes Time

Jordan Nanos

What's the timeline? When are we going to see this stuff ship, and when can I use one for the first time, do you think? Time to first code.

Copper Wei (Wega)

Well, there—

Myron Xie

The delivery systems ship in the second half.

Copper Wei (Wega)

Second half of the year.

Myron Xie

Yeah.

For time to first-token deployment, with Blackwell, it took a long time to get things stable even after systems shipped, right? It's probably the same for Rubin. Out-of-the-box performance straight away isn't always—it's, I guess, never really super-optimized.

Jordan Nanos

Yeah.

Copper Wei (Wega)

The design seems much more streamlined and integrated, right? So that should help, compared to GB200, where there were lots of challenges with manufacturing at the beginning.

The supply chain is also much more ready, right? The rack system assemblers have ramped up the capacity for rack-level manufacturing. These things need time for a capacity ramp, right? Because the assembly of these systems is very power-hungry, too. You're testing these systems at your assembly site, so you've got to have power secured.

That was also a challenge at the beginning of the GB200 ramp. The infrastructure for the ramp is ready, and the supply chain is ready, so it should be much smoother compared to GB200. But it's still a very ambitious, state-of-the-art rack, so there are always challenges during the ramp of these new systems.

With the speed that NVIDIA is pushing for things, there could always be hiccups. But, as Myron said, we're expecting second-half delivery of the rack system. That's delivery to the customers, and they have to set it up with the networking, bring in the on-site setup, and everything. There could be some availability in the second half, but mass deployment could be in the first half of '27.

Jordan Nanos

Going back to Blackwell, we saw pictures from CoreWeave with their first rack in November 2024, but people really started using it probably in February or March, and at scale around May or June 2025.

Copper Wei (Wega)

Yeah.

Jordan Nanos

So do you think it's a 2-year rhythm, where Blackwell Ultra with GB300 followed that same timeline in 2025, and then this one will be—

Copper Wei (Wega)

Actually, GB300 was much smoother. The transition from 200 to 300 was much smoother, right? There wasn't much of a hiccup between that transition. As you know, in the first half of '25, people had been working very hard to ramp Grace Blackwell deployment.

Going forward, with the supply chain and the data center side—the location and operations people being more familiar with the system—this process should be much more streamlined and familiar.

Jordan Nanos

Yeah. Okay. So let's stick to your—

Copper Wei (Wega)

The next big challenge will be Kyber, right? That's the next system.

Jordan Nanos

Right. So whatever milestone you want to pick—first engineering sample versus initial deployments versus at-scale deployments—do you think it's going to be a little less than 2 years between the first GB200 NVL72 and the first Vera Rubin NVL72?

Copper Wei (Wega)

You mean from samples to mass deployment?

Jordan Nanos

I'm saying that if you compare a given milestone—engineering sample to engineering sample or mass deployment to mass deployment—between GB200 and Vera Rubin, it's a little less than 2 years. It's not more than 2 years from what we saw with them, right?

Myron Xie

I think it'll probably be close to 2 years. It could come in under—

Copper Wei (Wega)

Maybe it'll be due to the GB200 delay, right?

Myron Xie

But, yeah, it'll be near 2 years.

Copper Wei (Wega)

It won't be as fast.

Jordan Nanos

Yeah. It depends on when you say Hopper was released, but they claim a 1-year rhythm, which would imply H100 to H200, B200 to B300, and now Vera Rubin to Vera Rubin Ultra, or anything in between, right? Each of those steps would be 1 year, and therefore the major change from Blackwell—the new name, Rubin—would be a 2-year difference.

Copper Wei (Wega)

It makes sense, right? We're on track for that. GB200 was, you know…

Well, there was some delivery in the single-digit racks in the second half of 2024.

Jordan Nanos

And a big announcement at GTC 2024, right?

Copper Wei (Wega)

Yeah, the announcement was made at GTC 2024, but the supply chain knew it wasn't going to be ready for the second half of 2024. That was impossible.

Jordan Nanos

Right. This Vera Rubin announcement came at CES 2 months earlier, in January, right? So that bumps up the timeline for everybody by 2 months. If Jensen makes the announcement 2 months earlier, now it's going to be a year and 10 months.

Copper Wei (Wega)

Yeah, but I think the supply chain is much more ready than when he announced GB200 at GTC 2024. There is a big difference in terms of supply chain readiness.

Jordan Nanos

Okay.

Copper Wei (Wega)

Yeah. But it is on track for that, right? The second half of 2025 is GB300, the second half of 2026 is Vera Rubin, and the second half of 2027 is the timeline scheduled for Rubin Ultra.